Sydney Waratah Trains

The Sydney Trains, commonly known as the Waratah trains, are double-decker electric multiple units operating across the Sydney Trains network. Delivered through a Public Private Partnership (PPP) between Downer EDI Rail and Hitachi for Reliance Rail, the initial order of 78 trainsets marked the largest rolling stock procurement in Australia’s history.

train
Challenge

CRRC Changchun Australia Rail required a Train Control & Management System (TCMS) capable of enabling the development of the world’s first fully Ethernet-based trains for Sydney Trains. The project encompassed a fleet of 79 double-decker EMUs, comprising 632 cars, and classified as A sets.

In December 2016, a follow-up order for 24 additional trains, known as B sets, also known as Sydney Growth Trains or Waratah Series 2 trains, required updated technology to complement the existing fleet.

Project Timeline

A Sets

  • Delivery Start: July 2011
  • Completion: June 2014

 

B Sets

  • First Order: September 2018 to June 2019
  • Second Order: September 2020 to June 2021
Scope of EKE-Electronic's Role

EKE-Electronics provided end-to-end support for the Waratah Trains project, including:

  • System Development:
    • Assembly, integration, commissioning, and training delivered both remotely and on-site.
    • Comprehensive documentation updated regularly based on feedback.

 

  • Safety and Reliability:
    • Safety-related analysis and documentation.
    • Life Cycle Cost (LCC) analysis.
    • Reliability prediction calculations.
    • Full RAMS (Reliability, Availability, Maintainability, and Safety) documentation.
Solution

The solution for both trainsets included:

  • EKE-Trainnet® Train Control and Management System (TCMS)
  • Ethernet Train Communication Network.
  • Event Recorders with Rugged Memory
  • 12.1” Touch Screens for drivers display
  • Passenger Information System Control
  • Radio Link interface
  • PLC Application for network, contol of systems, and monitoring and diagnostic capabilities
  • Portable System Tester for system configuration and debugging
  • Train Inspection Program for extracting and analysing event recorder data.
  • TrainDNA Integration
Key Benefit

Sydney Waratah Trains celebrated 10 years in service in 2021 and is achieving 99.4% availability for Australia’s largest fleet of passenger train.

Ongoing Partnership

The collaboration between EKE and Downer is built on mutual trust and a shared commitment to innovation. EKE-Electronics provides comprehensive hardware and software solutions, backed by lifetime support for proven technology.